TCCC
The Construction Contracts Co.
Subcontract Review
VIC
Trades / Tiling and flooring / Victoria

Tiling and flooring subcontracts in Victoria: what to check before you sign

In Victoria, a tiling subcontract is read alongside the Building and Construction Industry Security of Payment Act 2002 (VIC), which caps subcontract payment terms at 20 business days. The contract itself still decides the risks that cost tiling and flooring subcontractors most: substrate prepared by others; waterproofing responsibility; damage after completion.

AI risk report, not legal advice. The scanner gives general information about the risks in a document. It is not a lawyer, does not know your circumstances, and can be wrong. For decisions with legal consequences, get advice from a construction lawyer.

Scan a VIC tiling and flooring subcontract free
Free · no account · confidential · about two minutes

Victoria rules that override your contract

Statute: Building and Construction Industry Security of Payment Act 2002 (VIC)

  • Payment terms for subcontractors are capped at 20 business days after the payment claim. A longer term in the contract doesn't change that.
  • If the builder disputes a payment claim, it has to answer with a payment schedule within 10 business days (or any shorter period in the contract).
  • The Act was substantially reformed with effect from 15 April 2026: the old excluded-amounts and claimable-variations regimes are abolished, so damages, time-related costs and disputed variations can now generally be included in a payment claim, and reference dates are abolished too.
  • Adjudication: through a private authorised nominating authority; the reforms are recent and practice under them is still settling.

Victoria payment law in full →

Where tiling and flooring subcontractors lose money

Substrate prepared by others

Cracked or uneven slabs and failed screeds cause tile and floor defects. Make sure the contract lets you note substrate defects before starting and doesn't make you warrant someone else's work.

Waterproofing responsibility

If waterproofing is by others, the contract should say so clearly. Otherwise wet area failures default to the last trade in the room.

Damage after completion

Finished floors are damaged by trades still working. Protection and repairs caused by others should be the builder's cost.

Client selections and supply

Selections and supply delays outside your control should give you an extension of time.

Three things to push for in your departures schedule

  • Right to note substrate defects before starting, with no warranty of others' work
  • Waterproofing responsibility stated expressly
  • Repairs of damage by others paid as variations

The free scanner finds these clauses in your actual contract in about two minutes and writes the departures schedule for you.

What the Index says

Live figures from the Australian Subcontract Index, 90 real subcontracts. The Index holds no tiling and flooring contracts so far, under the 10-contract threshold, so these are national figures across all trades. Nothing under 10 contracts is ever shown.

100%have time bars that kill the claim entirely (66 of 66, all trades)
97%let the builder set off without notice (75 of 77, all trades)
78%have liquidated damages with no cap (31 of 40, all trades)
25 daysmedian payment terms (n=75, all trades)
5%median retention (n=65, all trades)
5 daysmedian notice window for variations (n=60, all trades)
See the full live Index →

Tiling and flooring subcontracts in other states

QLD · NSW · WA · SA · TAS · ACT · NT

Payment claim deadline checker →·Free notice templates →

Tiling and flooring subcontracts in VIC: common questions

How long does a builder in VIC have to pay a tiling and flooring subcontractor?

No more than 20 business days after your payment claim, whatever the contract says. If the builder disputes the claim, it has 10 business days to answer with a payment schedule giving its reasons.

Is a tiler responsible if the substrate cracks?

Not if the contract is drafted fairly. Note any substrate defects in writing before you start, and resist clauses that make you warrant the slab or screed prepared by others.

Where do VIC tiling and flooring payment disputes go?

Authorised Nominating Authorities (list via the Building and Plumbing Commission, formerly the VBA). Timing: through a private authorised nominating authority; the reforms are recent and practice under them is still settling.

Is this legal advice?

No. It is general information about common subcontract risks and the state's payment law as recorded in our registry. Statutory details change; check the current Act, and take the scanner's report to a construction lawyer for decisions with legal consequences.

General information, not legal advice. Statutory details are taken from our state law registry and change over time; verify them against the current Building and Construction Industry Security of Payment Act 2002 (VIC) before relying on them. Built by Mat Kennedy, Founder, The Construction Contracts Co.