Roofing subcontracts in Western Australia: what to check before you sign

In Western Australia, a roofing subcontract is read alongside the Building and Construction Industry (Security of Payment) Act 2021 (WA), which caps subcontract payment terms at 25 business days. The contract itself still decides the risks that cost roofing and roof plumbing subcontractors most: weather delay and notice; water damage to other trades; safety and access provided by others.

AI risk report, not legal advice. The scanner gives general information about the risks in a document. It is not a lawyer, does not know your circumstances, and can be wrong. For decisions with legal consequences, get advice from a construction lawyer.

Scan a WA roofing subcontract free
Free · no account · confidential · about two minutes

Western Australia rules that override your contract

Statute: Building and Construction Industry (Security of Payment) Act 2021 (WA)

  • Payment terms for subcontractors are capped at 25 business days after the payment claim. A longer term in the contract doesn't change that.
  • If the builder disputes a payment claim, it has to answer with a payment schedule within 15 business days (or any shorter period in the contract).
  • Two regimes run in parallel: contracts entered into from 1 August 2022 sit under the 2021 Act (East Coast model), while older contracts stay under the Construction Contracts Act 2004 with its 90-business-day adjudication window. The contract date decides which set of rules you're under.
  • Adjudication: under the 2021 Act, through authorised nominating authorities; under the old CCA 2004, an application must be made within 90 business days of the payment dispute arising.
  • A retention trust scheme is phasing in.

Western Australia payment law in full →

Where roofing and roof plumbing subcontractors lose money

Weather delay and notice

Wind and rain stop roofing work outright. Check whether weather gives an extension of time and how it must be notified; a daily notice with an absolute bar is easy to miss.

Water damage to other trades

If water gets in before the roof is complete or after other trades penetrate it, broad indemnities can make you liable for damage throughout the building. Limit liability to damage caused by your own work.

Safety and access provided by others

Edge protection, scaffold and hoisting are often the builder's responsibility. Delays in providing them should be delay events.

Penetrations by other trades

Services trades cut through finished roofs. Re-flashing and sealing their penetrations should be a variation.

Three things to push for in your departures schedule

  • Extension of time for weather with simple notice
  • Liability for water damage limited to damage caused by your own work
  • Re-flashing of other trades' penetrations paid as a variation

The free scanner finds these clauses in your actual contract in about two minutes and writes the departures schedule for you.

What the Index says

Live figures from the Australian Subcontract Index, 90 real subcontracts. The Index holds only 1 roofing contract so far, under the 10-contract threshold, so these are national figures across all trades. Nothing under 10 contracts is ever shown.

100%have time bars that kill the claim entirely (66 of 66, all trades)
97%let the builder set off without notice (75 of 77, all trades)
78%have liquidated damages with no cap (31 of 40, all trades)
25 daysmedian payment terms (n=75, all trades)
5%median retention (n=65, all trades)
5 daysmedian notice window for variations (n=60, all trades)
See the full live Index →

Roofing subcontracts in other states

QLD · NSW · VIC · SA · TAS · ACT · NT

Payment claim deadline checker →·Free notice templates →

Roofing subcontracts in WA: common questions

How long does a builder in WA have to pay a roofing subcontractor?

No more than 25 business days after your payment claim, whatever the contract says. If the builder disputes the claim, it has 15 business days to answer with a payment schedule giving its reasons.

Is a roofer liable for water damage caused after other trades cut the roof?

It depends on the indemnity and defects clauses. A well-drafted subcontract limits your liability to damage caused by your own work and makes sealing other trades' penetrations a variation.

Where do WA roofing payment disputes go?

Building and Energy, WA (DEMIRS), authorised nominating authorities. Timing: under the 2021 Act, through authorised nominating authorities; under the old CCA 2004, an application must be made within 90 business days of the payment dispute arising.

Is this legal advice?

No. It is general information about common subcontract risks and the state's payment law as recorded in our registry. Statutory details change; check the current Act, and take the scanner's report to a construction lawyer for decisions with legal consequences.

General information, not legal advice. Statutory details are taken from our state law registry and change over time; verify them against the current Building and Construction Industry (Security of Payment) Act 2021 (WA) before relying on them. Built by Mat Kennedy, Founder, The Construction Contracts Co.