Mechanical and HVAC subcontracts in Queensland: what to check before you sign

In Queensland, a mechanical subcontract is read alongside the Building Industry Fairness (Security of Payment) Act 2017 (QLD), which caps subcontract payment terms at 25 business days. The contract itself still decides the risks that cost mechanical and air conditioning subcontractors most: design and fitness-for-purpose obligations; plant lead times; commissioning at the end of the programme.

AI risk report, not legal advice. The scanner gives general information about the risks in a document. It is not a lawyer, does not know your circumstances, and can be wrong. For decisions with legal consequences, get advice from a construction lawyer.

Scan a QLD mechanical and hvac subcontract free
Free · no account · confidential · about two minutes

Queensland rules that override your contract

Statute: Building Industry Fairness (Security of Payment) Act 2017 (QLD)

  • Payment terms for subcontractors are capped at 25 business days after the payment claim. A longer term in the contract doesn't change that.
  • If the builder disputes a payment claim, it has to answer with a payment schedule within 15 business days (or any shorter period in the contract).
  • Adjudication applications go to the QBCC Adjudication Registry rather than a private nominating authority, and if the builder misses the payment schedule deadline it becomes liable for the full claimed amount and is barred from raising reasons at adjudication.
  • Adjudication: generally 30 business days from the relevant trigger for a standard application, lodged with the QBCC.
  • Statutory trusts apply on some projects.

Queensland payment law in full →

Where mechanical and air conditioning subcontractors lose money

Design and fitness-for-purpose obligations

Design and construct mechanical packages often carry a fitness-for-purpose warranty that goes beyond reasonable skill and care, and that kind of risk is usually difficult to insure. Read whether you are warranting performance outcomes or just your design.

Plant lead times

Chillers, air handling units and controls can have long lead times. Without an extension of time for supply delays outside your control, a factory delay becomes your liquidated damages.

Commissioning at the end of the programme

Commissioning needs power, finished ceilings and controls integration from others. If your completion depends on whole-building commissioning, you carry everyone else's delay.

Long defects and seasonal testing

Seasonal commissioning can push final testing out a year. Check how that interacts with your retention release and defects period so money isn't held twice.

Three things to push for in your departures schedule

  • Design warranty limited to reasonable skill and care, not fitness for purpose
  • Extension of time for plant supply delays outside your control
  • Completion of your works defined by your own scope and tests

The free scanner finds these clauses in your actual contract in about two minutes and writes the departures schedule for you.

What the Index says

Live figures from the Australian Subcontract Index, 90 real subcontracts. The Index holds no mechanical and hvac contracts so far, under the 10-contract threshold, so these are national figures across all trades. Nothing under 10 contracts is ever shown.

100%have time bars that kill the claim entirely (66 of 66, all trades)
97%let the builder set off without notice (75 of 77, all trades)
78%have liquidated damages with no cap (31 of 40, all trades)
25 daysmedian payment terms (n=75, all trades)
5%median retention (n=65, all trades)
5 daysmedian notice window for variations (n=60, all trades)
See the full live Index →

Mechanical and HVAC subcontracts in other states

NSW · VIC · WA · SA · TAS · ACT · NT

Payment claim deadline checker →·Free notice templates →

Mechanical and HVAC subcontracts in QLD: common questions

How long does a builder in QLD have to pay a mechanical and hvac subcontractor?

No more than 25 business days after your payment claim, whatever the contract says. If the builder disputes the claim, it has 15 business days to answer with a payment schedule giving its reasons.

What is the biggest risk in a design and construct mechanical subcontract?

Usually the design warranty. A fitness-for-purpose obligation makes you responsible for the system achieving an outcome even where you used proper skill and care, and that risk is usually difficult to insure. Push for a reasonable skill and care standard.

Where do QLD mechanical and hvac payment disputes go?

QBCC Adjudication Registry. Timing: generally 30 business days from the relevant trigger for a standard application, lodged with the QBCC.

Is this legal advice?

No. It is general information about common subcontract risks and the state's payment law as recorded in our registry. Statutory details change; check the current Act, and take the scanner's report to a construction lawyer for decisions with legal consequences.

General information, not legal advice. Statutory details are taken from our state law registry and change over time; verify them against the current Building Industry Fairness (Security of Payment) Act 2017 (QLD) before relying on them. Built by Mat Kennedy, Founder, The Construction Contracts Co.