Concrete and formwork subcontracts in Victoria: what to check before you sign

In Victoria, a concrete subcontract is read alongside the Building and Construction Industry Security of Payment Act 2002 (VIC), which caps subcontract payment terms at 20 business days. The contract itself still decides the risks that cost concrete and formwork subcontractors most: liquidated damages without a cap; weather and inclement days; quantity and design changes.

AI risk report, not legal advice. The scanner gives general information about the risks in a document. It is not a lawyer, does not know your circumstances, and can be wrong. For decisions with legal consequences, get advice from a construction lawyer.

Scan a VIC concrete and formwork subcontract free
Free · no account · confidential · about two minutes

Victoria rules that override your contract

Statute: Building and Construction Industry Security of Payment Act 2002 (VIC)

  • Payment terms for subcontractors are capped at 20 business days after the payment claim. A longer term in the contract doesn't change that.
  • If the builder disputes a payment claim, it has to answer with a payment schedule within 10 business days (or any shorter period in the contract).
  • The Act was substantially reformed with effect from 15 April 2026: the old excluded-amounts and claimable-variations regimes are abolished, so damages, time-related costs and disputed variations can now generally be included in a payment claim, and reference dates are abolished too.
  • Adjudication: through a private authorised nominating authority; the reforms are recent and practice under them is still settling.

Victoria payment law in full →

Where concrete and formwork subcontractors lose money

Liquidated damages without a cap

Because structure sits on the critical path, a late pour can delay the whole project. An uncapped liquidated damages clause exposes you to the builder's entire delay cost. Push for a cap, commonly 5 to 10 percent of the subcontract sum.

Weather and inclement days

Check whether wet days give an extension of time automatically or only above an allowance, and whether you need to notify each day. A daily notice requirement with an absolute bar is easy to miss in a wet month.

Quantity and design changes

Thickened slabs, extra reinforcement and late design changes change your quantities. A lump sum with no remeasure or rates for changes leaves the extra concrete and steel unpaid.

Pump, crane and access dependencies

If access, crane time or pump positions depend on the builder, the contract should treat interruptions as delay events, not your risk.

Three things to push for in your departures schedule

  • Liquidated damages capped at 5 to 10 percent of the subcontract sum
  • Extension of time for inclement weather with a simple monthly notice
  • Agreed rates for quantity changes and design revisions

The free scanner finds these clauses in your actual contract in about two minutes and writes the departures schedule for you.

What the Index says

Live figures from the Australian Subcontract Index, 90 real subcontracts. The Index holds only 8 concrete and formwork contracts so far, under the 10-contract threshold, so these are national figures across all trades. Nothing under 10 contracts is ever shown.

100%have time bars that kill the claim entirely (66 of 66, all trades)
97%let the builder set off without notice (75 of 77, all trades)
78%have liquidated damages with no cap (31 of 40, all trades)
25 daysmedian payment terms (n=75, all trades)
5%median retention (n=65, all trades)
5 daysmedian notice window for variations (n=60, all trades)
See the full live Index →

Concrete and formwork subcontracts in other states

QLD · NSW · WA · SA · TAS · ACT · NT

Payment claim deadline checker →·Free notice templates →

Concrete and formwork subcontracts in VIC: common questions

How long does a builder in VIC have to pay a concrete and formwork subcontractor?

No more than 20 business days after your payment claim, whatever the contract says. If the builder disputes the claim, it has 10 business days to answer with a payment schedule giving its reasons.

Are uncapped liquidated damages normal in concrete subcontracts?

They are common, which is why they are worth negotiating. An uncapped clause can expose you to the builder's entire delay cost for a package that may be a small share of the project. A cap of 5 to 10 percent of your subcontract sum is a widely used market position.

Where do VIC concrete and formwork payment disputes go?

Authorised Nominating Authorities (list via the Building and Plumbing Commission, formerly the VBA). Timing: through a private authorised nominating authority; the reforms are recent and practice under them is still settling.

Is this legal advice?

No. It is general information about common subcontract risks and the state's payment law as recorded in our registry. Statutory details change; check the current Act, and take the scanner's report to a construction lawyer for decisions with legal consequences.

General information, not legal advice. Statutory details are taken from our state law registry and change over time; verify them against the current Building and Construction Industry Security of Payment Act 2002 (VIC) before relying on them. Built by Mat Kennedy, Founder, The Construction Contracts Co.